Abstract:The construction of the comprehensive pipe gallery of Yaolong Road needs to pass through the current river channel of Sanlintang. This article mainly describes the management points in the supervision of the optimisation of the foundation pit enclosure scheme and the construction of the open-cut cast-in-situ pipe gallery in the inverted rainbow section of Sanlintang Port, which has reference significance for promoting the construction of the comprehensive pipe corridor.