Abstract:The secondary structure of large railway passenger station has its particularity in construction scope, content, technology and management. Combined with the engineering example, this paper analyzes the characteristics of secondary structure, summarizes the key points of construction organization and technical management, this paper expounds the construction process and technical key points of the project of planting steel bar, masonry, platform, track top air duct and shield cover in detail, and provides beneficial reference for similar projects.