Abstract:Through analyzing the engineering interfaces of the elevator project and related speciality projects in a sports building project in whole process including design, procurement, installation, and acceptance, the key links of interface management of the elevator in project each stage are summarized. Corresponding control measures are put forward, providing a whole process interface management method for the integration of the elevator and various related speciality projects in sports building projects.