Abstract:Long-span beam string structures are widely used in the construction of modern stadiums due to their excellent spanning capacity and spatial expressiveness. Their construction process is technically complex and high-risk, posing severe challenges to supervision and control. Based on the successful implementation of the 74.6-meter-span beam string structure in the Enshi Prefecture Ethnic Sports Center project, this paper systematically expounds the key points, implementation strategies and experience summaries of quality, schedule and safety control throughout the whole process—from ground assembly, initial ground tensioning, high-altitude hoisting to secondary high-altitude tensioning—from the perspective of the supervision party, providing reference for similar projects.